HT Excavator Piling Boom and Arm is designed specifically for piling construction with straight Boom and short arm, which could provide higher Max.height and making the operation of the machine more efficienct. The whole design is based on FEA and 3D Drawing, making sure it will meet your working needs.
Phosphating tube:
1) Better protect the Hydraulic system and extend service life.
2) Providing more power to the motion of arm and boom
3) Excellent anti-corrosion and anti-rust ability
Copper Sets:
1) Copper Sets are 6X durable than steel sets. Extend service life.
2) Better protect the Boom.
Great Welding:
1) All welding are done by experienced worker with, at least, four years of excavator attachment welding experience.
2) Inspection specialist checking while products under welding process, ensure every weld on the products.
Machine tonnage | Total Length of Boom and Arm(mm) | Max.Pilling Height(mm) | Weight(kg) | Total Height |
---|---|---|---|---|
Above 20T | 11000 | 9000 | 4800 | 3200 |
Above 30T | 16000 | 14000 | 5900 | 3380 |
Phosphating tube:
1) Better protect the Hydraulic system and extend service life.
2) Providing more power to the motion of piling.
3) Excellent anti-corrosion and anti-rust ability.
1. Before signing an official contract with our customers, we will help to analyze and provide professional solutions, recommdations based on the project information provided by customers.
2. An experienced tech-team are ready to meet your special requirements.
3. Your inquire related to our products or price will be replied in 24 hrs
4. Keeping our customers update about the orders' production process and arrange quality checking in the workshop is available if you want.
5. Online techinical supports are available for the whole product life. Oversea services are available with extra fees.
6. Shipment support is provided for our customer.
1.We pack it by film at first, then secure it inside the container by fixing to the container wall through steel wire.
2.One container can load 3 complete sets(we use rack to hold the upper sets).
3.Production leadtime is 15 days for 1 set, 20 days for 3 sets.
1. Are you a trade or a manufacture?
We are an industry and trade integration business, our factory loPCed on Guangzhou.
2. How can I be sure the excavator parts will fit my excavator?
Give us the correct model number/machine serial number/ any numbers on the parts itself. Or measure the parts give us dimension or drawing.
3.How about the payment terms for bulldozer parts?
We usuallt accept T/T or L/C. other terms also could be negotiated.
4. What is your minimum order for excavator undercarriage parts?
It depends on what you are buying. Normally, our minimum order is one 20 full containers and an LCL container (less than a container load) can be acceptable.
5. What is your delivery time for construction machinery parts?
FOB Chinese port :25-30days. If there are any parts in stock, our delivery time is only 7-10 days.
6.What about Quality Control?
We have excavator tester, check every piece to ensure the quality is good,
And strict control to ensure product safety into container.