HT Pilling Boom is designed specificly for Pilling construction.
Its for driving and pulling steel plate, cement pile, steel rail column iron plate, steel H-pile and drainage belt.
The boom is strighter than standard boom or long reach, in order to better suit the working needs.
Machine Tonnage | Length of Boom(mm) | Length of Arm(mm) | Lifting Height(mm) | Digging Radius(mm) | Digging Depth(mm) | Height(mm) | Cylinder(T) | Bucket capacity(m³) |
12T | 3000 | 2200 | 8100 | 6400 | 2450 | 3600 | 20 | 0.8 |
20-25T | 3500 | 2500 | 9300 | 7800 | 2600 | 3800 | 30 | 1.3 |
30-35T | 3800 | 2650 | 9550 | 8000 | 2800 | 4200 | 36 | 1.5 |
36-45T | 4100 | 2900 | 10500 | 8600 | 2900 | 4550 | 45 | 2.0 |